Residents Demand Bellways Completion of Cityfields Before Christmas
We, the concerned residents of Bellway Cityfields, have come together to address the pressing issue of unfinished construction work in our community. Our neighbourhood has been marred by several areas requiring immediate attention:
Road Surfacing: Numerous sections of our roads are in disrepair and in unfinished states, creating hazards for both motorists and pedestrians. Potholes and uneven surfaces demand immediate rectification for the safety and convenience of everyone living here. With winter setting in, the conditions are only going to worsen. Several residents have also experienced damage to their vehicles as a result of the poor condition of the roads around the development.
Unfinished Areas After Underground Pipe Works: There are various locations across the estate where underground pipe works have been revisited, leaving areas in a state of disarray. These areas must be restored to their original condition, enhancing the overall aesthetics of our neighbourhood.
Removal of Site Compound: The lingering site compound serves as an eyesore to not only our neighbourhood but the wider community passing by. It is also a safety concern due to the limited visibility entering and exiting the estate. It is essential that this unsightly compound is removed promptly, allowing us to enjoy the investment we have all made.
Landscaping Completion: Our community's landscaping remains incomplete, affecting the visual appeal and quality of life for residents. We demand that the landscaping work be finished to allow residents to enjoy what was promised.
Missing Road Signs: The absence of road signs poses a significant safety concern for both drivers and pedestrians. Proper road signage is essential for the smooth functioning of our neighbourhood for both deliveries and visitors. There are numerous streets within the estate that do not have road signage, including but not limited to Stanley Hall Drive, Stanley Hall Close & Ferry Mews
Street Lighting: Adequate street lighting is paramount for our safety, especially during the dark winter months. We call for the immediate installation or repair of street lighting fixtures to ensure our streets are well-lit and secure.
We, the undersigned residents of Bellway Cityfields, urge Bellway as the main contractor to prioritise these essential tasks and complete them before Christmas.
We believe that addressing these issues promptly will not only enhance the quality of life for all residents but also uphold the commitment to excellence that Bellway initially promised as a 5 Star Builder.
Should Bellway not complete the development before Christmas, we the undersigned will have no other option but to take this matter to the local and national press to leverage their reach.