Mountain Creek residents standing in opposition for zoning request change on Valley Bridge Road (Case Number 2024-0122).
We oppose the requested zoning change for reasons that include, but are not limited to:
- Traffic issues as cited in recent Corridor Study.
- Drainage issues with the wetlands behind Four Squares and Red Bank Elementary School.
- Flooding concerns with Mountain Creek.
- Increased load on already taxed infrastructure (electricity, water and roadways).
- Development Compatibility with neighboring structures.
- Easement and Buffer Zone encroachment.
- Access to proposed development for Fire, Police and EMS.
- Perceived lack of ability for proposed structures to be serviced without encroaching on public roadways or adjacent private property.
All the reasons stated on the petition but the other thing that is affected is the quality of life. Having green spaces is very important to our well being. This removes yet another green space which is also utilized by the wildlife which has nowhere to go if we keep builing.