PROTECT OUR COMMUNITIY: STOP APACHE STATION DATA CENTER

PROTECT OUR COMMUNITIY: STOP APACHE STATION DATA CENTER

8,648 signatures 1,352 to reach 10,000
L
Lisette t. signed
L
Lizbet F. signed
K
Kristina D. signed
K
Kayla B. signed
D
Danielle H. signed
L
Lauren B. signed
A
Adrianna D. signed
M
Megan M. signed
K
Kathy S. signed
M
Michele A D. signed
SD
Started by Stop Cochise Data Center

 To: Cochise County Planning and Zoning Commission and Cochise County Board of Supervisors We, the undersigned residents and property owners of Cochise County, oppose the Special Use Authorization sought by Tombstone Resources L.L.C. for a nine-building data center on 57 parcels along U.S. Highway 191 near Apache Station. Our families depend entirely on groundwater from an aquifer the State of Arizona has already declared over-drafted. Wells in the Sulphur Springs Valley are going dry, and residents are re-drilling and hauling water today. The developer has not disclosed how much water or power this project will use. It would place industrial buildings up to 40 feet tall, battery storage yards, and gas generators within 150 to 300 feet of homes, on a site outside any fire district.
We ask the County to: (1) deny the Special Use Authorization for this project; (2) require full public disclosure of water and power demand before any hearing; (3) protect rural groundwater by adopting a net-zero water rule or a moratorium on data centers in our basins. 

 

Updates

November 26, 2026

Who I am, and why I've been writing to you Happy Thanksgiving, neighbors and friends of Sulphur Springs Valley, For the past month, you've been reading letters, articles and posts signed "Stop Cochise Data Center." On this day of giving thanks, I'd like you to know who has been writing them. My name is Patsy Nyberg. HOW WE CAME TO THIS VALLEY My husband grew up in Cave Creek, back when it was wide open desert. Over the years, the city grew up around those open spaces. Still beautiful, but too crowded, too much traffic, too hectic. We have never been "city folk." It's funny: I've lived in cities my entire adult life, yet I've always had a yearning to go back to nature. For years we would travel down here to escape Phoenix and decompress. In 2009, my husband, our youngest son and I came to stay. We found our property on Craigslist: a dilapidated cabin on two and a half acres, no power, no water. My husband said, "That's just what I'm looking for." Today we live the way my husband lived as a boy. Off grid. We haul water and catch rainwater. We garden. We put every dime from the sale of our Cave Creek home into this land. It's a lifetime of hard work, blood, sweat and sometimes tears. Our son grew up here, and it must have left its mark, because he has come back to work here as an adult. We chose this place, with all its sacrifices, to live true to our hearts. We have driven two hours a day to jobs outside the valley so we could keep living here. We cook for ourselves. We endure hardships city life never knows. We create our own work and employ our neighbors. We keep our community safe, check on our neighbors and seniors, and still leave them the privacy they came here for. TEACHER, FREE SPIRIT, ARTIST I came here to teach culinary arts, in high schools and later taught in elementary schools across the county. I loved teaching. I was passionate, and I was lucky to have principals who let me teach. I gave each school everything I had, then moved on where my heart led. Yes, Mom called me a free spirit. My motto has always been Esto fidelis tibi ipsi: be true to yourself. A couple of years before I retired from teaching, I went into real estate. My husband had always said I should, and he was right. I'm in my element helping others. My passion is art in all its forms. These past few years, I've helped people discover the beauty and peace of Cochise County. I always tell clients the truth: "If you enjoy shopping, dining out or the entertainment a city provides, this may not be for you." This area isn't for everyone. But for some of us, it's just what we've been dreaming of for a long time. And it is like a dream. It starts as a feeling that won't go away, as if something is missing. That feeling becomes a longing, and the longing becomes a need. Then the dream begins to take shape, and the search begins. Like so many others who have found their forever homes here, we feel this place is sacred. God the Creator calls us to guard it, treasure it and keep it for future generations. THE BOMBSHELL So when this news blindsided us, it felt like a terrible joke. A letter dated Saturday, October 17, went out to a handful of homeowners near Apache Station. It came from a company called Tombstone Resources L.L.C., formed in Wyoming that summer. It described a 6-gigawatt data center on 747 acres beside the Willcox Playa. It didn't say who was behind the company, and it said nothing about a battery plant. When I saw that letter posted online by a property owner south of the site, I knew it would take fast action. We've seen quiet land deals slide past the public's attention before. Even now, a month later, there are neighbors who have no idea what's happening, or where. I slept on it, and I woke up knowing I had to act, immediately. There was no time for meetings and discussions, and that isn't how I work best anyway. I started a petition. I hoped that maybe 100 people would sign. Today, more than 8,500 of you have. Groups began to sprout up and do their own work. Information was coming from every direction in bits and pieces, and it was causing more confusion than focus. So I built a website: one central place where every document could be analyzed and every finding posted. HOW IT UNFOLDED And then the story kept changing. The application was rewritten, and then rewritten again. On November 2, seventeen pages changed, and a battery plant appeared, described as "the largest single-site BESS system in the world." The neighbors who got that first letter were never told. The application said no new production well would be drilled. Yet State records list 28 wells on the proposed parcels. Every day brought something new. I'd wake up, open the County's website, and find another piece of the puzzle that should have been on the table from the start. Then came the town hall on November 4 at Cochise Elementary. That's where we finally learned the company behind Tombstone Resources was SpaceX. I went hoping for answers. What I found was a sales pitch. Attendance was limited. Slides went up with print so small no one in the room could read it. There was no open question-and-answer where all of us could hear each question and each answer. Instead, people were sent to talk one on one at separate tables. Neighbors who had just learned their homes, their water and their way of life could change felt shut out, and some began shouting from their seats. It was chaotic, and it shouldn't have been. People deserved better that night. They deserved to be heard. THE TIMING Look at the calendar. Public comments are due at noon on Friday, November 27, the day after Thanksgiving. The hearing is December 9, in the middle of the holiday season. And if the Commission approves the project, anyone who wants to appeal has 15 days, which runs out on December 24, Christmas Eve. I can't tell you why it was scheduled this way. But I know families are busy this time of year, and many people simply won't be paying attention. That's why I'm writing to you today. WHY I DIDN'T STEP FORWARD SOONER I never wanted to be the face of a protest. This was never supposed to be about me. It's about this land, our water, the sandhill cranes on the playa and the ground beneath our homes. I wanted the facts to stand on their own, so no one could dismiss them by going after the person who shared them. I also wanted to protect my family and my private life. That's why I created a separate Facebook page for this work. I believe I deserve a quiet life, and so do all of you. WHY I'M SPEAKING UP NOW Last week, a Cochise County Supervisor went on a local radio program and dismissed our petition. She said most of the signers don't live in Cochise County, that no one from outside should be telling us what to do, and that the opposition is "paid activists" spreading "disinformation." So I'd like to answer, plainly and in my own name. No one pays me, and I wouldn't accept it if they offered. The petition platform was free. The domain name cost about $15, the website costs $25 a month, and I've spent about $30 on paper. A small investment. The time has been priceless. Every fact I've shared comes from a public record: the State's own geologists, the Attorney General, the Arizona Department of Transportation, the County's own words and the application itself. If anything I've posted is wrong, show me, and I'll correct it publicly. HOW THE SIGNATURES WERE CHECKED Because every voice matters, I took care with every name before it went to the Commission. • Anyone who signed more than once was counted once. • Entries without a full first and last name were removed. • Obvious fake names and nicknames were removed. • No one was removed because of where they live or what they wrote. Comments appear as written, except a small number with profanity, personal attacks or off-topic remarks, and those signers are still counted. • Email addresses were kept private, but they're available to County staff on request for verification. The list I filed is one alphabetical list of names, with each signer's own words beside their name. I didn't sort it by where people live, because where someone lives doesn't tell you their stake in this valley. Many signers live right here. Many others own property here but live elsewhere, have family here, or come back year after year: for Wings Over Willcox when the cranes return, for the Willcox wine festivals, for Chiricahua National Park. They spend their money in our towns, and they love this valley for the same reasons we do. Because each name had to be checked first, the list I filed is smaller than the petition's running total. The petition is still open. Every new signature will be checked the same way, and I'll bring an updated list to the hearing on December 9. A petition doesn't tell anyone what to do. It asks the Commission to listen. THANK YOU To everyone who signed, shared, commented, wrote to the Commission or asked a hard question: thank you. To the property owners, families and visitors who love this valley as much as we do: thank you. You've given me more hope than you will ever know. This Thanksgiving, I'm grateful for this place, for this valley's wide-open spaces, and for all of you. If you haven't yet, please send your comment before noon tomorrow, Friday, November 27. And I hope to see you at the hearing on Wednesday, December 9, at 2 p.m., 1415 W. Melody Lane, Building G, in Bisbee, or online. With gratitude, Patsy Nyberg Stop Cochise Data Center

Over 7000 strong: now one more step before Friday

November 19, 2026

Friends of our communities in the Sulphur Springs Valley, Cochise Stronghold, Chiricahua National Park, and the Sandhill Cranes. We did it together: 7,018 signatures against SU26-22, the 6-gigawatt SpaceX data center and the "largest single-site" battery plant proposed on 747 acres beside the Willcox Playa. That is no small thing. In just over three weeks, neighbors from Pearce, Sunsites, Cochise, Willcox, Benson, Sierra Vista, Bisbee and Douglas and all over Arizona and the country have stood up together. Families who grew up here, crane watchers, ranchers, retirees and visitors who love this valley have all said the same thing: not here. Now we need your voice in the County's own record. The Planning and Zoning Commission votes on December 9. Its decision is final unless appealed, and an approval runs with the land, forever. The petition shows our numbers. A comment in the County's record shows the Commission exactly why. GET YOUR COMMENT IN BY TOMORROW, NOV. 20, TO BEAT THE HOLIDAY DEADLINE. It takes about three minutes. Our comment builder writes it with you, then takes you straight to the County's form: stopcochisedatacenter.com If you need a reason, the application gives you plenty: • No traffic study, for 5,500 workers on two-lane Highway 191 • No noise study, put off until "building permit" • No geology study, though the site sits in a State-mapped earth fissure area • No emergency plan, on a site "outside any fire district" • About 90 megawatts of gas generators, with no emission limits • It says "no production well." The State lists 28 registered wells on the site • The promises of lower bills and big payments are not in the application at all We are told the details will "come later." But later is too late. The vote on December 9 decides whether this land is suitable. Once it is approved, it cannot be taken back. THREE THINGS YOU CAN DO TODAY 1. Write your comment at stopcochisedatacenter.com (by Nov. 20). 2. Forward this email to five people who love this valley. Ask them to sign: go.ipetitions.com/ahs5Eq 3. Save the date: Wednesday, December 9, 2 p.m., Board of Supervisors Meeting Room, 1415 W. Melody Lane, Building G, Bisbee. You can also speak online. Every seat filled tells the Commission who this valley belongs to. This valley, our wells, our dark skies, our air and our health are worth protecting. 7,018 of us agree. Let's make sure the Commission hears every one of us. Ask the Commission to deny SU26-22. With gratitude and determination, Stop Cochise Data Center stopcochisedatacenter.com [email protected]

Reached 5,000 supporters

November 17, 2026

4000 Strong: what's changed, and what to do before Nov 20

November 14, 2026

Title: 4,000 strong: what’s changed, and what to do before Nov. 20 Thank you! More than 4,000 of you have signed in under three weeks. The application has changed three times since this petition started, so here are the current facts: The current application covers 31 parcels on about 747 acres beside the Willcox Playa and Apache Station. It’s a 6-gigawatt AI data center plus a 24 gigawatt-hour battery plant, which the applicant calls “the largest single-site BESS system in the world.” SpaceX has confirmed it’s behind the project. The site is in the Willcox Active Management Area. The application says “No production well,” but the State’s Well Registry lists 28 registered wells on those parcels. No legal water right is identified for construction water or the “trucked water” it plans to use. The County’s emergency planners recommended six conditions on Nov. 12, including a study of whether local responders can handle a battery fire. They estimated the site’s emergency plan could take 6 to 12 months. The vote is Dec. 9. What you can do now: Send a comment by Fri., Nov. 20 to beat the holiday deadline. The official deadline is Fri., Nov. 27 at noon. Send our ready-made letter to the Governor, the Attorney General and our members of Congress. It takes five minutes and has a fillable version at stopcochisedatacenter.com. Come to the hearing: Wed., Dec. 9, 2 p.m., 1415 W. Melody Lane, Bisbee, or on Microsoft Teams. All three application packages, our comparisons and the emergency planners’ findings are at stopcochisedatacenter.com. Stop Cochise Data Center

Reached 2,500 supporters

November 6, 2026

Reached 1,000 supporters

November 1, 2026

Reached 500 supporters

October 28, 2026

Reached 250 supporters

October 27, 2026

Reached 100 supporters

October 25, 2026

2,819 Comments

D
Dawn Turner Verified
Featured

We've already seen the negative impacts on ground water and electric bills in areas where data centers are going in. Bad enough for county leadership to consider a facility that will so dramatically affect the utility bills of local residents, but worse is the impact this would have on ground water. Leadership at all levels in Arizona have long encouraged conservation and careful water usage, and then they go and consider an application like this? Please don't do it!

I
Ioana Datcu Verified
Featured

Our groundwater is not renewable. Our wells are getting drier and deeper. Our water and electrical bills are getting higher almost every year.

K
Karen Fasimpaur Verified
Featured

This is about money and investor interests, not what serves we the people. Hyperscale data centers use water and power. The huge resources an industrial project brings to bear to make it seem like this isn't the case aren't something our small rural county can easily counter. This project is on a fast track with huge funding. If you oppose it, now is the time to act.

P
Peggy Gattis Verified
Featured

This area is my home. This AI Center does NOT belong in our desert all ready short on water and resources. Human beings, pets, herd animals and wildlife LIVE HERE.

R
Renee Sowards Verified
Featured

Not a good fit for an area that already has extreme water shortages. This area will be a ghost town if these facilities are allowed

L
Lisette t Verified

Protecting the land where many communities and wildlife would be affected♥️

K
Kayla Barton Verified

We cannot sustain this type of structure.

D
Danielle Haines Verified

Migratory birds are extremely important and if that gets overlooked for a data center, we are failing as humans who are the protectors of the planet