Skip to main content
ELMWOOD SIDEWALK INITIATIVE

ELMWOOD SIDEWALK INITIATIVE

242 signatures 8 to reach 250
N
Nina S. signed
K
Karen W. signed
F
FRANCIS k. signed
L
Lauren K. signed
M
Matthew N. signed
T
Thomas M. signed
K
Kirsi J. signed
A
Alice C. signed
M
Margaret F. signed
S
Sarah M. signed
LM
Started by Lauryn McCabe

PETITION TO THE TOWN OF BRIGHTON, NEW YORK
IN SUPPORT OF SIDEWALK CONSTRUCTION ALONG ELMWOOD AVENUE

To: The Honorable Supervisor and Members of the Town Board of the Town of Brighton, New York; the Town of Brighton Department of Public Works; and all other officials with jurisdiction over public infrastructure within the Town of Brighton.

Re: Petition in Support of the Construction of Public Sidewalks Along Elmwood Avenue Connecting to East Avenue starting at Brookside Drive and ending at Clovercrest Drive where there are currently sidewalks.

I. Preamble

We, the undersigned residents, property owners, and taxpayers of the Town of Brighton, Monroe County, New York, respectfully submit this Petition to formally express our strong support for, and to request prompt action toward, the design, funding, and construction of a continuous public sidewalk along Elmwood Avenue, beginning at its intersection with East Avenue and running westerly to the eastern terminus of the existing sidewalk at Clovercrest Drive (the "Project").

II. Background and Need

High-Volume Corridor. Elmwood Avenue is a heavily traveled east-west arterial that connects residential neighborhoods in Brighton to schools, places of worship, the University of Rochester, Strong Memorial Hospital, retail establishments, and the broader regional roadway network.

Pedestrian Safety Gap. The segment of Elmwood Avenue between East Avenue and Clovercrest Drive currently lacks a continuous pedestrian walkway. Pedestrians — including children walking to and from school, students, joggers, dog walkers, transit users, and individuals with mobility limitations — are presently forced to walk along the roadway shoulder, the grass verge, or private lawns, in close proximity to vehicular traffic traveling at posted speeds of up to 35 miles per hour.

Connectivity. Sidewalks already exist west of Clovercrest Drive. Completing the missing segment from Clovercrest Drive easterly to East Avenue would create a continuous, ADA-compliant pedestrian connection linking the existing Elmwood sidewalk network with the East Avenue corridor and adjoining neighborhoods.

Public Health, Quality of Life, and Property Values. Walkable infrastructure has been shown to encourage physical activity, reduce vehicle trips, support local businesses, enhance neighborhood character, and increase residential property values — consistent with the goals of the Town of Brighton Comprehensive Plan.

Equity and Accessibility. A continuous, ADA-compliant sidewalk will provide safe pedestrian access for residents of all ages and abilities, including children, seniors, individuals using wheelchairs or other mobility devices, and parents with strollers.

III. The Requested Action

The undersigned respectfully request that the Town of Brighton:

(a) Formally include the Project in the Town's capital improvement plan and prioritize it for design and construction at the earliest practicable date;

(b) Identify and pursue all available funding sources, including but not limited to Town capital funds, Monroe County funds, New York State Department of Transportation programs (including the Transportation Alternatives Program (TAP) and CHIPS), and federal Safe Streets and Roads for All (SS4A) and similar grants;

(c) Engage with affected property owners and residents in a transparent public process regarding the design, alignment, drainage, tree preservation, and any easement or right-of-way considerations;

(d) Coordinate with Monroe County and the New York State Department of Transportation as appropriate, given the classification of Elmwood Avenue; and

(e) Construct the sidewalk to current ADA accessibility standards, with appropriate curb ramps, crosswalks, and pedestrian signalization at the East Avenue intersection.

IV. Statement of Support

By signing below, each of the undersigned affirms that he or she:

Is a resident, property owner, or taxpayer within the Town of Brighton, New York;

Supports the construction of a continuous public sidewalk along Elmwood Avenue from East Avenue westerly to the existing sidewalk at Clovercrest Drive; and

Respectfully urges the Town Board and all relevant officials to take prompt action to advance the Project.



Updates

ELMWOOD AVE SIDE WALK INITIATIVE _ Nov 2nd Update!!!!

November 2, 2026

First off, thank you to everyone for this immense support for this "Elmwood" sidewalk initiative and to the 200 residents (and counting) that have signed this petition to not only make our community safer, but to connect us to our town center which is what Brighton is all about, community and connectivity. I know I have gone radio silent for a short minute, but be reassured that I have still been working diligently behind the scenes in making progress in moving this project forward. This has included meetings with town supervisor candidate and current board member, Nate Salzman, town board members Christine Corrado and Clara Sanguinetti. We are waiting for the Town Of Brighton to complete an engineering assessment of the project. The engineering department is currently short staffed so we do not have a timeline for that to be completed.  In addition to engaging town leadership, we have begun discussions with County legislator Susan Hughes – Smith and County executive Adam Bellows Office. Currently, Monroe county is offering matching funds for sidewalk projects on County roads. We hope to be able to take advantage of this program. To top that, we have been in touch with our state Senator Jeremy Cooney himself who has also pledged his support to work with us making this sidewalk come to fruition including helping us find the additional funding we'll need to make this happen. Please support him in our election tomorrow !!!!!  We encourage everyone to talk to our local, county and state representatives to let them know this project is a priority. This is only the beginning, but I feel confident with everyone's support we can make this happen.  I promise to do my best to keep you guys up to date on any further progress.  PS. HUUUUUUUUUUGGGEE "THANK YOU" to Jim Hondorf who has been pivotal in guiding me through this uncharted and daunting process.  All my best, Lauryn McCabe

Reached 100 supporters

July 16, 2026

61 Comments

M
Mary C Boyd Verified
Featured

Adding the proposed section of sidewalk will provide a much needed safe walking area along an incredibly busy road: Elmwood Avenue.

R
Rina Chessin Verified
Featured

This is important because I am walking on the side of the road everyday! Sometimes twice a day. Sidewalks would keep me safe!

J
Jen Ohara Verified
Featured

Safety for all. Especially for our kids. They will be able to safely go to their cousins house from Knollwood to east ave. Thanks!!

A
Amy Judson Verified
Featured

We live at 3541 Elmwood Ave and my kids like to ride bikes to 12 corners and the village but riding on Elmwood Ave to reach the already established sidewalks is VERY dangerous. Would love a side walk!!!

L
Leslie Henckler Verified
Featured

We live on Elmwood and it is dangerous to walk along the roadside. We’ve wondered since we’ve lived here why no sidewalks on the section of Elmwood that’s so busy.

N
Nina Schor Verified

This is a matter of public safety in a family-oriented community.

L
Lauren Kaduc Verified

This project would improve pedestrian and vehicular safety and greatly improve the quality of life in the Elmwood Avenue area.

T
Thomas Murray Verified

I’ve worried for years seeing people walking on elmwood between clover and east. One of these days someone is going to get hit. It’s time to invest.

Help this petition grow

Share it with friends to help reach 250 signatures.

Your share link

Share directly