Finish Singing Wind Road Construction

Finish Singing Wind Road Construction

Closed — 16 supporters Verified

Final supporters

J
Jonathan M.
J
Jessica M.
S
Someone
T
Trenissa B.
S
Sienna
D
Daniel V.
S
Someone
C
Craig D.
S
Stacy H.
A
Aspen A.
+6 more
LL
Started by Lisa Lisa 7 years, 10 months ago
I moved to Trails End in August and am about to be on my third tire replacement due to the construction that has has been going on since the beginning of the summer and I know I’m not the only one. The workers on that road are almost always on a break when I peek out to see what is going on or they are not present at all. The road seems to be getting worse each day. I believe it has become dangerous to drive on this road especially if you have a sedan. Let’s get the city’s attention by gathering as many signatures as possible!

6 Comments

T
Trenissa Brown
7 years ago Featured

I have had to repair my tires about 4 times since this has started . Paying anywhere from $10-$18 every time.

C
Craig Davis
7 years ago Featured

They had one side of the street ready to pave, sealed, even with the curb swept and then they change their mind. Was this lack of planning?

J
Jonathan McClure
7 years ago

Needed a complete renovation but taking waaay too long

A
Aspen Alba
7 years ago

This is unacceptable!!

B
Belinda salinas
7 years ago

It should have been done long ago. That road is bad on small cars.

K
Katie Pieper
7 years ago

Agreed!!!!!

Share Petition

Don't stop at signing, share the petition link with friends to multiply our impact

Copy link or share directly

Instagram
QR Code