THE AJAX MINE PROJECT IS OFFICIALLY CANCELLED!! WE STOPPED THE DESTRUCTION OF OUR GRASSLANDS AND PROTECTED OUR WATER FOREVER!! STAY VIGILANT AS WE MONITOR THE SITE RESTORATION BUT FOR NOW CELEBRATE THIS MASSIVE VICTORY!!
The proposed Ajax Mine project threatens to destroy 2,500 hectares of Kamloops' treasured grasslands and divert toxins into Inks lake as well as create a diversion of Peterson Creek which spills directly into the Thompson River. It plans to create a Processing Plant and a 3 km long by a km wide Tailings Storage facility, with a 8 km long and 150 m high wall that will surround toxic waste from the mining operation. Leakage will result in disastrous consequences. This project will consist of 24 hour light, sound and atmospheric pollution for a life expectancy of 23 years.
what about the water?? we dont need toxic waste leaking into the thompson. this is our home not a dump site.
D
Dave Greer
14 years ago
Featured
Ridiculous project. Nobody wants this right in their backyard. Stop it now.
J
Jessica Petersen
14 years ago
Featured
my kids play near peterson creek. this is seriously messed up.
M
Mike Wright
14 years ago
Featured
Total disaster for kamloops. The dust and noise will be unbearable for everyone living nearby. NO AJAX.
S
Sarah Wheeler
14 years ago
Featured
Keep our air clean. Do not let them ruin the grasslands for a quick buck.
T
Tom Kennedy
14 years ago
Featured
23 years of lights and noise? are you kidding me. protect the grasslands.
Share Petition
Don't stop at signing, share the petition link with friends to multiply our impact
Copy link or share directly
Instagram
QR Code
THE AJAX MINE PROJECT IS OFFICIALLY CANCELLED!! WE STOPPED THE DESTRUCTION OF OUR GRASSLANDS AND PROTECTED OUR WATER FOREVER!! STAY VIGILANT AS WE MONITOR THE SITE RESTORATION BUT FOR NOW CELEBRATE THIS MASSIVE VICTORY!!
The proposed Ajax Mine project threatens to destroy 2,500 hectares of Kamloops' treasured grasslands and divert toxins into Inks lake as well as create a diversion of Peterson Creek which spills directly into the Thompson River. It plans to create a Processing Plant and a 3 km long by a km wide Tailings Storage facility, with a 8 km long and 150 m high wall that will surround toxic waste from the mining operation. Leakage will result in disastrous consequences. This project will consist of 24 hour light, sound and atmospheric pollution for a life expectancy of 23 years.
what about the water?? we dont need toxic waste leaking into the thompson. this is our home not a dump site.