The Scottish Govt. should give serious consideration to an alternative design of the Stonehaven fast-link junction. An alternative junction design has been presented to Transport Scotland, which allows the traffic to flow much smoother without any requirements for traffic lights and roundabouts and with very little disruption to Stonehaven. The alternative design proposes to take the traffic from the A90 onto the fastlink by means of a slip road slightly further along the A90 (between the existing Netherley turn off and the matrix sign) A new fly over would be constructed over the A90 in the same place as the off slip, to feed the southbound traffic off the fastlink back onto the southbound A90 and this junction would also create a new slip road off the A90 to replace the crumbling road that currently runs down by the golf course. It would also mean that there would be no requirement to dismantle the existing A90 bridge that runs over the B979 causing many months of disruption to traffic on the A90 during the construction of the junction for the fastlink.
Transport Scotland has received our proposal but refuses to engage with the technical benefits of this alternative design. Please email your local representative today to demand they address this direct path to reduced congestion. We keep pushing until they agree to meet and review these plans.
March 9, 2012
This sudden surge confirms that the community rejects the current plan that threatens our local roads. Take a screenshot of this page and post it to Facebook right now. Email your local representative today and demand they review the alternative design immediately.
Reached 100 supporters
March 9, 2012
6 Comments
S
Sarah Coleman
14 years ago
Featured
Why make it so complicated and disruptive when a simpler option exists? Just build it properly.
M
Morag Reeves
14 years ago
Featured
Please listen to the locals who actually drive this road every day. The alternative design is much better for everyone.
D
Dave Sanders
14 years ago
Featured
Common sense for once? Would be nice. The proposed route is just gonna cause gridlock for years.
G
Gordon Kim
14 years ago
Featured
The current plan is a total nightmare for anyone who actually lives here. Use your brain and go with the alternative.
A
Alan May
14 years ago
Featured
Sick of the council ignoring better ideas. Do it right the first time so we dont have to deal with endless construction.
F
Fiona Mitchell
14 years ago
Featured
Living in Stonehaven means dealing with enough traffic as it is. We dont need months of roadworks on top of that. This makes way more sense.
Help this petition grow
Share it with friends to help reach
250 signatures.
Sign Petition
We never post to your account. Social sign-in is used only to verify your signature.
or sign with Email
Add a comment?
Your signature will be added via
.
Tell others why you're signing — it's optional.
The Scottish Govt. should give serious consideration to an alternative design of the Stonehaven fast-link junction. An alternative junction design has been presented to Transport Scotland, which allows the traffic to flow much smoother without any requirements for traffic lights and roundabouts and with very little disruption to Stonehaven. The alternative design proposes to take the traffic from the A90 onto the fastlink by means of a slip road slightly further along the A90 (between the existing Netherley turn off and the matrix sign) A new fly over would be constructed over the A90 in the same place as the off slip, to feed the southbound traffic off the fastlink back onto the southbound A90 and this junction would also create a new slip road off the A90 to replace the crumbling road that currently runs down by the golf course. It would also mean that there would be no requirement to dismantle the existing A90 bridge that runs over the B979 causing many months of disruption to traffic on the A90 during the construction of the junction for the fastlink.
Transport Scotland has received our proposal but refuses to engage with the technical benefits of this alternative design. Please email your local representative today to demand they address this direct path to reduced congestion. We keep pushing until they agree to meet and review these plans.
March 9, 2012
This sudden surge confirms that the community rejects the current plan that threatens our local roads. Take a screenshot of this page and post it to Facebook right now. Email your local representative today and demand they review the alternative design immediately.
Reached 100 supporters
March 9, 2012
6 Comments
S
Sarah Coleman
14 years ago
Featured
Why make it so complicated and disruptive when a simpler option exists? Just build it properly.
M
Morag Reeves
14 years ago
Featured
Please listen to the locals who actually drive this road every day. The alternative design is much better for everyone.
D
Dave Sanders
14 years ago
Featured
Common sense for once? Would be nice. The proposed route is just gonna cause gridlock for years.
G
Gordon Kim
14 years ago
Featured
The current plan is a total nightmare for anyone who actually lives here. Use your brain and go with the alternative.
A
Alan May
14 years ago
Featured
Sick of the council ignoring better ideas. Do it right the first time so we dont have to deal with endless construction.
F
Fiona Mitchell
14 years ago
Featured
Living in Stonehaven means dealing with enough traffic as it is. We dont need months of roadworks on top of that. This makes way more sense.
Help this petition grow
Share it with friends to help reach
250 signatures.
Sign Petition
We never post to your account. Social sign-in is used only to verify your signature.
or sign with Email
Add a comment?
Your signature will be added via . Tell others why you're signing — it's optional.
Signing with Google or Facebook verifies your signature instantly — no email needed.
Why make it so complicated and disruptive when a simpler option exists? Just build it properly.