Skip to main content
#say yes to priotity work, no solar for now

#say yes to priotity work, no solar for now

77 signatures 23 to reach 100
T
Tejaswini P. signed
S
Sumsti F. signed
D
Dinesh T. signed
A
Archana T. signed
M
M D. signed
R
Rutu S. signed
P
Prajakt B. signed
N
Nikunj N. signed
K
Kundan signed
A
Anup signed
US
Started by Utkarsh Shinde 6 years, 7 months ago

To,

Chairman /Secretary

Kalpataru Splendour Co Op Hsg Ltd,

Wakad Pune.

Subject: Concerns regarding solar installation in society

Reference: With reference to the society notice dtd. 22nd December 2019 and ADDA notification dtd. 24th December 2019, we would be raising one time adhoc invoice of Rs 4000/- against all members for contribution towards the Solar Power project of 50 KWp capacity. This was approved via the resolutions 10.1 and 10.2 of the AGM held on 29th September 2019.

Respected chair,

Solar notification received n 24/12/2019, for which had mailed ( Prasad Nair) the synopsis of the solar feasibility , received acknowledgment of the same but we are curious to know how is the raised concerns addressed and rectified in such short time as we can see the work has already started. Some points which are our concern are pointed out.

- Electrical bill analysis of all bills, the capacity comes to 228 kWp

Our reuirment is 228 kWp and we are loking at poject of 50kWp what this help us in for 50kWp why are we investing so heavely.

- Have checked every building with its obstacles & water heater installations. Roofs of all 9 buildings are covered with maximum shadow

- As per available area on A, B, C & D building the capacity can be installed is 4.5 kWp each i.e 18 kWp for all 4 building. (Elevated by 3 mtrs.)

- For low capacity elevation is a costly affair

- Building E is not having space

- Building F, G, H & I –

a) If we install ground mount there is a shadow of elevated RCC roof of 6 meter height on both sides

b) If we elevate by 3 meters, customers water heaters gets covered by solar PV shadow

-As per our knowledge the subsidy is closed since 05/2019.

Data reference: (https://www.insolergy.com/blog/solar-subsidies/solar-energy-subsidy-maharashtra/)

If subsidy is closed then the project becomes highly expensive for which SGM should be called.

For Example:

Description

Cost

Cost of 1 kW rooftop solar system

1,00,000

Subsidy @ 30%

30,000

Cost after subsidy

70,000

Accelerated Depreciation @ 80%

56,000

Tax rate @ 35% saved after AD

19,600

Net Cost after Subsidy and AD savings

50,400

Now if we remove the subsidy part then what are we saving, also these projects are taxable.

Data Ref:( https://economictimes.indiatimes.com/small-biz/productline/power-generation/solar-panel-cost-price-range-of-different-types-of-solar-panels-and-how-much-govt-subsidy-can-you-avail-for-installing-one/articleshow/69327365.cms)

Hypnotically if we accept that subsidy is available but, it comes after completion certificate received that takes around 1 to 1.5 yrs, so till then the capital investment is ours for which we could have earned interest in banks.

Data Ref: (https://www.insolergy.com/blog/solar-subsidies/solar-energy-subsidy-maharashtra/)

Have we received the commissioning certificate from msedcl if yes then it needs to be put up where the work site is as per standard so that members can know exactly what is the project cost who is the company and in how many days it will get over.

How can a potential installation contractor give honest views on feasibility his main intention is to sell his product not educate, so third party consultant be brought and survey should be made available where all concerned parties should be presented.

Have link of pune mirror which has stated the grievance of a person for whom the net metering system became headache and by producing more power than he consumed but was charged same and units were not provided in bill, we could also get into this same trouble.

Data Ref: (https://punemirror.indiatimes.com/pune/civic/no-subsidy-no-waiver-solar-panel-users-left-high-and-dry/articleshowprint/63571548.cms?prtpage=1)

In the AGM only few members attended and voted and this is concern as not all can attend, so it to bring into your kind attention that the project be again taken upon and prior item like STP up gradation , PAVERBLOCKS, INTERCOM be the big ticket item that needs to be checked upon, also we have moved from old light fixture to led lets proceed in that direction with acceleration, our is a society which came into existence in 2016, charge was given in 2017 so let’s take baby steps and not hurry in projects which are environmentally good but let’s create a great social ethos in the society so that in the next 5 yrs we can get ready for such solar projects also.

Also the Rs.4000/- invoice has last date of 15th Jan, after which 21% interest will be charged , would like to know under which section of MCS act is this provision allowed. Would like to state that no payment will be made until concerns addressed

To sum up we would like to ask the chair to put the solar project on hold and take a SGM and clear all concerns.

Updates

December 30, 2019

I have spent recent days compiling our specific technical concerns regarding the shadow analysis and system capacity to present to the committee. We are currently waiting for a formal response that addresses why the current proposal does not align with our actual energy consumption patterns.

53 Comments

M
M D Gadre c303
6 years ago Featured

There is a substantial risk of returns on investment. Presently installed systems of STP, solar heating are giving difficulty in maintenance. Be practical and do not take risk with members money. Complete essential work.

R
Rahul Singh
6 years ago Featured

The ask from the other society members is straight and simple. Prioritise things. Things that impacts most people should be taken first and then only invest huge amounts on other projects. 25 lakh is big amount for solar project. It has to be done only after proper explanation and consensus among all and only if it's required.

A
Avinash Thosar
6 years ago Featured

A 101 Splendour.Agree with the contents Dont be in hurry to implement Solar power system yet.The cost is prohibitive and returns not guaranteed.

S
Suman Jacob F902
6 years ago Featured

I do not support the Solar installation, until current issues are resolved and the project economical viability is well demonstrated and clarified.

D
DK Gupta
6 years ago Featured

I think before investing in solar power we shall stabilise STP and other priority issues related to water , security and Hygine.

T
Tamal Bhattacharjee
6 years ago Featured

I am not against solar installation in society however it should be prioritized and other basic needs should be addressed first

D
Dinesh Tawar
6 years ago

Yes for priority work and No for solar please

A
Archana Thakur
6 years ago

Say yes to priority work and keep solar project on hold.

Help this petition grow

Share it with friends to help reach 100 signatures.

Sign Petition

We never post to your account. Social sign-in is used only to verify your signature.

or sign with Email

Add a comment?

Your signature will be added via . Tell others why you're signing — it's optional.

By signing, you accept iPetitions Terms of Service and Privacy Policy.

Share Petition

Don't stop at signing, share the petition link with friends to multiply our impact

Copy link or share directly

Instagram
QR Code