Singhaiyi Group finally caved and agreed to fix the disaster they call our homes. They had no choice after we refused to let their shoddy workmanship slide any longer. Keep your eyes open to ensure these repairs actually happen as promised.

June 8, 2016

Petition For a Better Home For All

Petition For a Better Home For All

🏆 Won — 189 supporters Verified

Final supporters

S
Someone
L
Lim H.
J
Juvene L.
J
Jolyn T.
C
Chan S.
Y
Yan L.
C
Charles N.
L
Lim W.
D
Doris L.
T
Tien W.
+179 more
CT
Started by Citylife Tampines

To : The Management of Singhaiyi Group Ltd

Dear Sir/Mdm

Unsatisfactory workmanship at CityLife@ Tampines

1) We refer to the above matter.

2) We wish to complain about the extension and other works that were carried out in the units and communal area at the above address from Mar to May 16.

3) The petition aims to seek clarity for the developers to accomplish the following issues:

i) Perennial Internal and External issues regarding finishing, designs oversight and safety concerns.

ii) Poor Workmanship

iii) Slow Progress of Defects Rectification

4) The quality of works were of unsatisfactory standard, which led to several defects ranging from the type of materials, finishes, appliances, furnishing, etc to be used or provided for a unit and the common facilities did not meet the workmanship set out in the Sales & Purchase Agreement.

5) We would like to meet the key stakeholders from the developers, main and sub contractors, relevant architects and structural engineers every month to discuss in details for the way forward to address the issues.

6) While it is not necessary to engage into resolution measures such as neutral evaluation, arbitration or litigation, our confidence remained buoyant in our developer to construct and build good and workmanlike manner in accordance to the specifications set out in the Sale & Purchase Agreement as well as the plans approved by the Commissioner of Building Control and other relevant authorities.

7) Please note that the purchasers have generally ensured all the payments due to the developer were made promptly according to the payment schedule in the Sale & Purchase Agreement. We must request that the developer rectify these issues as soon as possible as we cannot use the extension in its present condition(s).

Yours faithfully

Residents comprising units at Citylife@Tampines

Updates

June 1, 2016

SingHaiyi Group continues to ignore our demands despite the massive groundswell of residents demanding accountability for their shoddy work. This momentum proves that we will not tolerate their incompetence or their failure to meet basic safety standards any longer.

Reached 100 supporters

June 1, 2016

133 Comments

A
Angie Toh
Featured

1. Cannot stomach the kitchen top cuts into the door frame and make it appears so unsightly. This should not be happening especially in a luxury ec. 2. Floor tiles are supposed to last for years but I cant say about our floor laminate. 3. inconsistent materials used for flooring and skirting found in dual key studio units. One part is tile flooring with tile skirting but the other end is tile flooring with laminate skirting.

J
Joshua
Featured

59, #04-18 The irony was not lost on me that they were so efficient in billing me for maintenance (6mths at that) while not as effecient when it came to rectifying the defects.

Y
Yeo Ying Chuan esther
Featured

Support the cause of this petition to voice our displeasure in our unit delivered in unsatisfactory and unacceptable condition which differs from the original model and pics during sale of unit. Misrepresentation of the brochure with intend to mislead buyers into paying premium of a so called luxury ec. Immediate rectifications and actions required of management.

O
Ong Wee Reng
Featured

Disappointed owner of Blk 51, #11-03. Can't believe developer of a 'luxurious hotel-style' residence can hand over unit in such terrible condition- Sliding doors which can't slide, laminate flooring which sinks in near the window frame, floor grouting which come off with the slightest scratch. Common area defects such as missing lobby door stopper leading to dented wall from the repeated hitting of door handle on the plaster wall, floor level alphabets mounted to the wall via double sided tape instead of proper adhesive..just to name a few. Extremely poor project management. Supervision/inspection of contractors' work during the construction phase seems to be non existence.

K
Karina
Featured

Disappointment on the following even after rectification: 1. Laminate flooring quality for bedrooms 2. Discoloration of doors 3. Living room tiles grout filling 4. Extension of shelter/trellis approval process too long 5. Silicon/sealers for few areas in bad condition.

M
My Rights
Featured

Quality of work is by far the worst ever in the industry. Unit is handed over with broken tiles at eye level, broken doors, uneven tiles, ridiculously sloppy paintwork, etc. To top things off for the bad quality of work, rectification works take forever to start and complete. Residence have to hunt and chase after workers and repeatedly remind them on defects that had already been logged. This is a 1 million sgd property with no quality of work.

A
Anonymous

The quality of the fixture and fittings used by the developer was of inferior quality (i.e. Room laminate flooring and kitchen table tops).

J
Jolyn Teo

53, #08-07