Chalmers Bennett 0

Opposition to the Geauga Power Line Project

134 people have signed this petition. Add your name now!
Chalmers Bennett 0 Comments
134 people have signed. Add your voice!
54%
Maxine K. signed just now
Adam B. signed just now

Fourteen months ago, Geauga County (OH) residents and property owners learned that two FirstEnergy Corp. (FE) subsidiaries had jointly applied for a certificate to construct a new 138kV power line on one of two routes from Lake County through Thompson, Montville, and Huntsburg townships. One route, designated

Sponsor

The Citizens Advocating Responsible Energy (CARE) is an organization of citizens opposed to The Geauga County - 138kV Transmission Line Supply Project as it has been proposed by FirstEnergy. Specifically, it shall be the purpose of CARE to (1) Oppose the construction of a new transmission line utility corridor through Thompson, Montville and Huntsburg townships in the interest of preservation and conservation, (2) Advocate the use of a pre-existing civil corridor for a new transmission line, such that neither the over-land nor the Clay Street routes, as applied for by FirstEnergy, are constructed, (3) Create a common, unified voice through which CARE members may communicate with FirstEnergy, The Ohio Power Siting Board, the legislature and the courts. It is important to realize that CARE does not promote the use of one of the two proposed routes (the over-land or the Clay Street) over the other. Both routes proposed in FirstEnergy\'s application involve creating a new utility corridor through farms, neighborhoods, virgin woods, and residential properties. These are not acceptable places to create a new utility corridor, therefore CARE opposes the proposed project. Opposing the project without offering alternatives is not productive, therefore CARE advocates the use of pre-existing civil corridors as sites for a new transmission line. Fortunately, there are pre-existing corridors that are suitable for a new transmission line. CARE will work to persuade the Ohio Power Siting Board that FirstEnergy should be using the available pre-existing civil corridors.

Links

CARE\'s website - http://www.caregeauga.org Power Line Forum - http://www.caregeauga.org/roundtable About The Geauga County - 138kV Transmission Line Supply Project - http://www.huntsburg.org/
Share for Success

Comment

134

Signatures