Skip to main content

Traffic management and delays on the A9 between Perth and Inverness

95 Comments

R
Robert Jenkins
9 years ago

The programme being followed (if a programme of works even exists) is not even an amateur attempt at traffic management. Why close dual carriageway sections to work on before the single carriage sections have been made to dual? This has only made the a9 resemble the road it was before it had any dual sections, so to make it a better road, we have to put up with years of it being worse than it ever was?!!! Someone in a position of power really needs to answer to this & face the type of consequences us mere peasants would face if showing the complete lack of thought, planning & management in our own jobs, being flagrantly displayed by this bunch of incompetent outfits

T
tariq karim
11 years ago

Quickest way to ruin a relaxing day out in th highlands, use the A9.

P
Peter Murray
11 years ago

Travelling from Inverness to Perth is taking 1 hour longer .If work was being carried out it may be acceptable but when no work is in progress it is very wrong .

A
Andrew Simpson
11 years ago

Why speedlimit when no works ongoing? Why 40 limits on motorways in Scotland for roadworks but 50 limit in England?

A
Allan Comrie
11 years ago

Typical inefficiency!

D
david mackay
11 years ago

shocking road management!

C
Clare Lockhart
11 years ago

Do the work or take out the cones - simples

D
Dianne Pallett
11 years ago

This road is appallingly managed!

A
Anonymous
11 years ago

5 miles of 40mph with nothing going on is absolutely ridiculous.

A
Andy Bart
11 years ago

Cones and not a workman in site,it's all about tricking motorist for the cash,shame on you

L
Linda burgin
11 years ago

Cones no one working 40mph for mo apparent reason those appalling cameras frustration is causing more problems and leading to more accidents on a road that has more than its fair share

A
Allan
11 years ago

Something needs to be done asap!

J
james welding
11 years ago

kincraig has been over run by people avoiding the road. as i live on the side of the old a9 y should we put up with are village being used as a rat run

J
james welding
11 years ago Featured

i live in kincraig on the road side and the traffic has become unbelievable throw the village with people avoiding the speed cameras. and the speeds they are doing. there has already been a crash in the village.

A
Anonymous
11 years ago

40mph , long delays, no work ongoing -

C
Christine Simpson
11 years ago

Why 40mph and NO work?

C
Christine Simpson
11 years ago

Show that we need oit to be 40mph

A
Anonymous
11 years ago

I fully appreciate the need for traffic management at road works but this is an extremely poorly thought out system. Please can you do something to improve traffic flow at these roadworks.

J
Jacklyn moyes
11 years ago

I travel a lot and it's slow going if your Stuk behind a lorry or 2 but then to have 4 mile of road works with nothing going on when I went down 40 miles hour and back up week later and still no sign of anything going on. Since the cameras being put up its added half hour to my trip I don't mind if I'm safe but their are some people that take chances but 4 hour delay with nothing much hangings I sent good no wonder folk take chances

D
Darryn Youngson
11 years ago

Diverting north and South travelling traffic through small towns on the A9 is a disgrace