Skip to main content

A55 Road Works

748 Comments

J
Julian
10 years ago

It's a pain in the a55

A
Adam Roberts
10 years ago

This is a matter that needs to be sorted as I've seen many near misses on the sychnant pass, this is getting dangerous!!!

S
Susan
10 years ago

Needs sorting as quick as possible.

R
R. Hughes-Burton
10 years ago

As a person who has a bodily function issue, Being caught in traffic on the A55 which could of been avoided with a little thouht and consideration, was very uncomfortable for me and my passengers. yours sincerley sore and smelly

D
Denise Fisher
10 years ago

Not sure why the petition site has me living in Eccles when I live in Dwygyfylchi????

D
Denise Fisher
10 years ago

It took me 1 hour to travel between Llandudno Junction and Dwygyfylchi turn-off on Monday around 11.30. This is ludicrous! It might have been quicker had motorists obeyed the one lane instruction but of course there are a number of people who think it is their right to get to the front of the queue and hold up everyone else!The only alternative from where I live is to travel over the Suchnant Pass, which is unsafe for heavy traffic!

A
Andrew Wright
10 years ago

Talk about a good way to scare business away from North Wales. No thought at all for haulage companies let alone their drivers.

M
Margaret Smith
10 years ago

peak times to be addressed urgently

A
Andrea Roberts
10 years ago

The A55 has been a constant source of road works since the initial opening many years ago!!

N
Nigel beidas
10 years ago

A55 roadworks are now imposing sizeable costs on local businesses and a radical rethink is required on how and when the works arecarried out.

B
Bernice Golding
10 years ago

A journey from Liverpool should not take 4 hours. Most of the time is sat in traffic at Penmaenback tunnels. This journey normally takes 2 hours . It is putting people of visiting Wales.

R
ryan griffiths
10 years ago

It takes me 30 minutes to do the 3 mile stretch of roadworks. The roadworks should not be active during peak hours.

P
Peter Barnard
10 years ago

The A55 is the M4 of North Wales. This level of disruption would not be tolerated in that corridor.

J
Julian Beadle
10 years ago

Very poorly conceived with no consideration of the road user or local population. Local businesses severely affected and students arriving late for classes so education disrupted as well. All minor roads dangerously filled with motorists desperately trying to go about their daily work. This is disastrous!

M
Martin Kressman
10 years ago

A contraflow should be set up on the eastbound carriageway permanently throughout the period of the work and the contractors made to work 24/7 in the westbound tunnel instead of working only at night.

A
Alun jones
10 years ago

25 minutes waiting at red traffic light to go through tunnel at 3:50 am . Disgrace

R
Richard
10 years ago

Nearly run off the road inside the Conwy tunnel as Irish coaches ignore the RED filter arrow and push pass. Traffic Officer did nothing but watched.

A
Anonymous
10 years ago

sortiwch y sothach

G
Gwyn Mowll
10 years ago

Plenty of money to create all this chaos for over 20 years now on the A55. But not a penny in all that time to fix local roads which are full of potholes.

P
Paul
10 years ago

Help