We request SDG&E’s proposed transmission line project (TL6975) running approximately 12 miles, connecting the San Marcos substation to the Escondido substation not be built by adding additional above ground power line poles.
Instead, we propose the new transmission line be built underground as outlined in SDG&E’s proposed alternative route C in SDG&E’s "PROPONENT’S ENVIRONMENTAL ASSESSMENT", dated November 15, 2017 or through a combination of alternatives that SDG&E has considered that meet the project objectives.
This petition is being circulated by a volunteer.
Above ground power lines are a fire and safety hazard. The fire hazard will only increase as global warming wreaks havoc on the climate. New lines need to be installed underground. This benefits everyone including SDGE. SDGE's liability from wildfire caused by downed power lines is greatly reduced with underground installations.