We, the undersigned, as residents of the community known as
Shadow Creek which is located in the county of Hays, state of Texas,
represented by the zip code 78610, and who are members of the home owners
association known as Shadow Creek Homeowner’s Association through payment of
dues verifiable by the addresses on this petition, hereby formally request:
1. A
resident representative on the Board of Directors before December 2015
2. A
covered pavilion in the play-scape area
3. Availability
to the bathrooms with the key fob year round starting on June 1, 2015 with the
monitoring of the use of said fobs
4. Firm
open and close dates for the swimming pool, within a reasonable season and
option for year round
5. Evaluation
for better fencing around the pool area, possible increase to 12 foot enclosure
as to deter trespassing
6. Established
pool access hours before and after posted hours on a household request basis
limited to adults over the age of 17 for purpose of exercise not horseplay or
parties.
7. Evaluation
for a second swimming pool to accommodate population increase to be estimated before
March 2016 and installed within a timely manner after evaluation.
8. Fixing
of the waterscape area inside the swimming pool before July 2015. This to include the regular treatment for
fire ants in the grass and removal of broken furniture.
9. Two
pool monitors for monitoring use at gate and use in pool with verification of
fob use to disallow access without residency or resident accompaniment.
Specifically on weekends and after school hours.
10. Monitoring
of fob entry by time stamp and video surveillance and enforcement of trespassing
laws set forth in the county of Hays with criminal prosecution.
11. Gating around the play-scape and or basketball courts accessible by key fob to reduce
destruction of property and defacement of common area
12. Resurfacing
and re-grassing the soccer field before November 2015.
13. Gated
enclosure on east of soccer field for off leash dog area
14. Restructuring
of the water run off for the hike/bike trail before June 2015
15. Installation
of lights on the hike/bike trail estimated before August 2015 and installed
before January 2016
A written
response to the items requested in this petition is requested no later than
Friday, the 15th of May, 2015.
The response may be mailed to our representative at Southwest Management
who will then share it with the community via email.
I don't believe we should worry about fencing and key fob entry into the play area and basketball court.