Skip to main content
Dwight PCB Report Follow Ups

Dwight PCB Report Follow Ups

126 signatures 124 to reach 250
S
social b. signed
L
Lowell T. signed
T
Talli C. signed
L
Laureen M. signed
B
Bo y. signed
C
Camie W. signed
J
Jen M. signed
R
Ron H. signed
L
Lynn D. signed
J
Jack M. signed
Started by Anonymous 13 years, 3 months ago

To Members of the Fairfield Board of Education: 

We, the parents of Timothy Dwight Elementary School, are concerned with several issues contained in Woodard & Curran’s PCB Assessment Report of Dwight School.   These concerns have been brought to the attention of Central Office and are as follows:      

1) We need the fireproofing material on Dwight's gym to be chlorine screened by Woodard & Curran.  It is unacceptable that only a visual inspection was done and no chlorine screening because the "material was not accessible for the primary chlorine screening".  We request that this be done as soon as possible so results can be communicated to our school community before the end of the school year.   

2) We need to find out if the stone flooring at Dwight, which was cited in the report as being "visually similar flooring" to that in Osborn Hill School, is covered with the same sealer as was used in Osborn Hill.  The sealer applied to the stone flooring in Osborn Hill was tested and found to contain PCBs.  We acknowledge that the report states that "It is not known if this material was manufactured with PCBs or contained PCBs as a result of a cross-contamination effect from the gymnasium source" at Osborn Hill.  However, we believe it is imperative that the sealer used at Dwight is investigated further. 

3) Woodard & Curran recommended follow-up evaluations at Dwight, which "could include more detailed inspection and survey of suspect materials with follow-up interim measures, as needed, to potentially include covering any deteriorating sealants or suspect sealants in high exposure potential areas;"  We would like to know the timeline for such work at Dwight.  

We respectfully request the Board of Education’s prompt attention to these issues.   Additionally, we request a response on these action items prior to the next meeting of the Dwight PTA on Tuesday, June 4, as an update will be expected by our community at that time.   

Thank You, 

Concerned Members of the Timothy Dwight School Community 

 


Updates

May 20, 2013

The Board of Education is still quiet regarding the school flooring and gym inspections. Call the central office today and demand they release a public testing schedule for the stone sealer and fireproofing material.

May 20, 2013

The momentum behind this petition is undeniable and shows that our community will not accept vague assessments regarding our children's school. Take this momentum and call the Board of Education office today to demand a timeline for the chlorine screening. Text this link to three neighbors who have students at Dwight so they can help us keep the pressure on.

Reached 100 supporters

May 20, 2013

6 Comments

J
Jen Stone
13 years ago Featured

Totally unacceptable standard of care for an elementary school. FIX THIS.

S
Sarah Tate
13 years ago Featured

My kids spend so much time in that gym. Visual inspection is not enough. We deserve real answers about what they are breathing in every single day.

T
Tom Grant
13 years ago Featured

Unreal that we even have to ask for this. do your jobs.

M
Mike Patel
13 years ago Featured

STOP CUTTING CORNERS WITH OUR CHILDRENS HEALTH. Test the material properly and stop making excuses.

L
Lisa Holmes
13 years ago Featured

getting really tired of waiting for the board to take this seriously. test the gym now before school lets out.

D
David Wright
13 years ago Featured

How can you say something isnt accessible so you just wont test it? Get someone in there to do the job right.

Help this petition grow

Share it with friends to help reach 250 signatures.

Your share link

Share directly