Abbotsham Road Access Issues

264 Comments

R
Richard Hayler
1 year ago

Devon council are a disgrace approving this closure and then not monitoring that any work is actually being done - shame on you all at highways

A
Anonymous
1 year ago

This road is a main road that people use so much traffic and hard getting from A to B now

K
Kristy Elson
1 year ago

Awful delays and congestion with school drop off and pick up. Terribly thought out closure.

M
Martyn Baddick
1 year ago

Whilst we can all understand that infrastructure works are needed for housing projects, the amount of time allocated for these works, and the lack of consideration for local residents, is shocking. The developers should have been given a maximum 4 week window to complete this, with significant financial penalties for overrunning. As it is, it is we the existing residents that are paying these financial penalties so that the developers can maximise their profits.

C
Colin Horsham
1 year ago

I genuinely can’t afford the taxi bill to go around the road closure It’s a massive problem given the length of time it’s shut for is it really necessary ? Probably not. I generally used to visit the thatch twice a week and now I don’t. Shame really

I
Ian Powell
1 year ago

Absolute chaos trying to get home in the morning after a night shift on school days

A
Anonymous
1 year ago

Unreasonable

S
Sandra Bright
1 year ago

This closure is having a major impact on my daily commute and causing delays and increasing danger to road users and pedestrians via the diversion route.

M
Martin Loader
1 year ago

The disruption is totally unacceptable

A
Ann Pill
1 year ago

Disgusting

R
Rob
1 year ago

Once again the needs of local residents totally ignored via poor planning and project management.

B
Barbara Webb
1 year ago

This road is used regularly by school traffic to Bideford College and workers going to work.It should not be completely closed.

D
Dawn stanton
1 year ago

These roadworks have caused mayhem and put 20 minutes on our journey to work and extra fuel . Been closed far too long

J
Jeff Blight
1 year ago

Totally ridiculous developers should be made to do these jobs a quickly as possible the traffic up moreton park and past the college is an accident waiting to happen

P
Pill
1 year ago

Disgraceful

S
Sarah Evans
1 year ago

It’s a joke! I live on collage park and my son attends a school which is 5 minutes away, now we have to go all the way around through narrow roads to get to school which takes an extra half an hour. The same with Barnstaple again traffic is horrendous and squeezing through tiny spaces isn’t ok.

H
Helen Phillips
1 year ago

Closure is disrupting my business, and signage is making it difficult to find how to access us. So many local diversions in place that no one can follow the correct route around.

A
Anonymous
1 year ago

Moreton Park Road cannot cope now with all of the extra traffic. The road surface is terrible and will be made worse the longer this goes on. What are they doing that takes so long anyway?

S
SK
1 year ago

There has been total poor management of these works. Totally inefficient. The longer it takes, the more money there is to be made!! It's unbelievable how the Powers That Be think how insignificant local people are! *'Hiding' ads at the back of a newspaper that not everybody reads; *Providing a helpline number whose prefix code was deemed not suitable for public use back in 2014, due to its high cost; *Causing major distribution to peoples' lives, costing them extra time on their journeys, *Extra fuel costs (the only way to access parts of Bideford and Abbotsham is via the appalling Moreton Park Road, which had totally been neglected and has already caused damage to several vehicles). For those who need to access Abbotsham Primary School and Kenwith Castle Care Home, it is causing massive distress , expense and upheaval. The project is already behind schedule. It's a complete nightmare for local residents!! 1) we should have been given more notice 2) we should have been told WHY the works is going to take so long 3) compensation should be paid to those who have incurred greater expense on necessary journeys 4) compensation should be given to those whose cars have been damaged by having to use Moreton Park Road 5) Moreton Park Road should have been repaired BEFORE all the extra traffic was forced to use it. 6) WHY is it already behind schedule??!! Often, VERY OFTEN, we see very little activity going on at the site. An utter disgrace. Don't tell me there aren't people making real money out of this to the detriment of ordinary lical men, women and children!! This could have, and should have been handled more openly, more efficiently and on a lower budget.

J
Julie Buckley
1 year ago

It’s time these road closures were looked into before granting permission. ! Rediculous