Skip to main content

Abbotsham Road Access Issues

265 Comments

R
Richard Kirton

1. Not informed, no letter, no announcement 2. Progress is at a snails pace 3. No activity at all in first 3 days 4. The workers who do attend seem to do shifts. 1 work, 1 watch, 1 on his phone. I guess they rotate? 5. The diversions are not thought out, they add more traffic to roads that are already very busy 6. To take my children to school less than a mile away takes 40-45 minutes! Each way! Not great for the environment or my fuel bills! I'm told that the road will be dug up again as another company needs access, but the 2 companies can't work on the same road? Someone got a backhanded for this!

A
Andrew Pearce

Residents were not properly consulted and if there t is proposed it may be closed for 18 months, this is completely unacceptable! 5 months would have been bad enough.

H
Holly Cunningham

Having the road closed my journey to school has been extremely stressful having to drive round which feels like the whole of Bideford for a two minute drive.

D
Dermot Mcgeough

Unacceptable, DCC need to resolve promptly. If this was in Exeter a solution would have been found within days. Email has been sent to Highways and the cabinet member for highways supporting the residents. Not only is it crippling Bideford Town, it is having a detrimental effect wide spread.

A
Anonymous

Council should not let the developers do what they want. They make millions causing disruption to peoples life, polluting, cutting trees down and getting away with it. All with council permission.

M
Mrs Caroline Youngman

Causing more time and milage and of course more fuel costs . Not much of a warning either .

M
Mi k Paine

This is impacting my plumbing business massively. I have a large van and have to dotour through Moreton park road 3 or 4 times a day to just get to screwfix. I'm sick of driving past the works and there been nobody working even though the weather is fine. I have worked in construction for over 30 years and know this work could be done in a matter of weeks with minimal access issues if run properly. There is no excuse for a full road closure.

A
Anonymous

This is appalling and must not be allowed.

A
Amanda wills

Absolutely ridiculous that no other arrangements were made for residents or anyone wishing to use this road. What soukd take me 3 minutes to visit my mum now takes 15/20 and even then you take chance with the diversions on narrow roads, and huge potholes. No thought was given to this.

R
Robin Gould

It's unnecessary.

L
Lindsay Ross

Awful driving up moreton park (the diversion) for my child’s school drop offs & pickups. Road is not fit for purpose (pot holes) and so busy.

K
Kathleen Smith

As stated concern for emergency access. Access to schools, dr surgery. Impossible route down Moreton Park when buses in opposing direction. Night time work would shorten works. Concerns for ancient Devon hedges and wildlife.

K
Karen Harley
Featured

To completely close the road is ridiculous, no emergency acess there's is not even pedestrian access, someone from the council should get up from behind their desk and try walking a diversion. A solution with acess for all needs to be found.

N
Nick Wallace

Road needs to be open, access desperately needed

S
Sue

If Abbotsham Road is currently too narrow to have single lane work done along the length of it how will it accommodate traffic from the hundreds of houses proposed

A
Anonymous

No consideration for the daily disruption and cost to hundreds of families

H
Heather BOWDEN

I live on lime grove and the traffic had increased on our road as a result. The junction at the bottom of Pitt Lane is a nightmare in the morning as it is now a detor. I work in woolsery so need to access the A39, the extra traffic and having to navigate smaller roads through town adds stress to my morning. I am suprised there has not been a collision, there have been near misses!

R
RT

It has affected my business and personal life a great deal

R
Ross Huggins

These works haves caused major disruption to local residents. The diversion is unsuitable for large vehicles and is causing excessive congestion. The diversion is adding considerable cost to motorists. A further extension of 18 months to this road closure is unacceptable. Developers should be running these services across their own plots not under public roads causing months of road closures.

J
Julie Downing

I understand the need for renewing pipes but when nobody is working on it it seems ridiculous!! Better planning is needed.