Ridiculous delays, surely there's got to be a better solution. The delays are are so painful.
D
dan struthers
10 years ago
Sort this mess out
M
mark
10 years ago
stuck in heavy traffic on oct 26th for extra hour on my trip when turned out only 4 men working in one spot at the side of the road absolutely unnecessary ridiculous amount of restricions and i strongly believe all A55 roadworks should be done 24/7 to get their job done - its a primary road and work should be over and done with not a 9-5 mon to friday job
C
Colin
10 years ago
Inept management by Conwy Council, North Wales Trunk Road Agency and the Welsh Goverment
M
michelle mabbs
10 years ago
Please review
M
Mark Southee
10 years ago
Very little consideration to half-time holidays. And how much did the work on Penmaenmawr roundabout last year cost given that it's now being removed.
A
Anonymous
10 years ago
This is turning my already 50 minute commute into a 2.5 hour one on some occasions!
A
Anonymous
10 years ago
Driving through there seems to be very few people working. Why can't they just cone off one small section at a time? Why can't they get an army of workers in and get the work done in a couple of weeks? It's regularly taking one and a half hours to get home after work, which is unacceptable!
G
Gareth Jones
10 years ago
I've been hit in the back while crawling. Luckily no damage but still very unsettling!
V
Vanda Rawlins
10 years ago
The chaos during peak times needs to be addressed!
L
Liz Pycroft
10 years ago
It will effect our family lots and with my mum being disabled would take far too long to get places, stuck in the traffic. The money that will be lost to Anglesey too will be huge.
D
David davies
10 years ago
I had to que with my horse for 90mins last week. He was terrified whist I was in the tunnel due to the loud noise in there. I was stressed out to the point I was sweating as I thought he was going to injure himself.
Now I am trying my best to avoid going down the A55 yet again. It's a joke that this treach of road is only open 50% of the time since it was built. Don't you people realize it's the only road to get in and out of north wales without having to travel miles and miles out of your way.
S
Shan Eccles
10 years ago
cant this work be done during evening hours
A
Anonymous
10 years ago
i work at both Llandudno Hospital and Ysbyty Gwynedd and these delays are causing so many problems for both staff and patients alike!
M
Mark taylor
10 years ago
Use some commen sense please,or is this too much to ask ???
V
v.beech
10 years ago
Making my journey to work untenable. Adding 2hours to my day!
A
Anonymous
10 years ago
Yet again poorly planned A55 roadworks causing massive inconvenience and significant economic costs to the residents and visitors to North Wales. A rethink is required urgently!
L
Linda
10 years ago
we are living under siege in Conwy can't get to work on time disgusting that a vital arterial route is managed in this way.when it is all about the workforce being to lazy to remove cones
J
jill willams
10 years ago
takes 1-3 hours to get home when should be 40 mins joke
P
Penny yarwood
10 years ago
2 hours to do 5mins!!! Every day!!! Sort it out!!!
Ridiculous delays, surely there's got to be a better solution. The delays are are so painful.
Sort this mess out
stuck in heavy traffic on oct 26th for extra hour on my trip when turned out only 4 men working in one spot at the side of the road absolutely unnecessary ridiculous amount of restricions and i strongly believe all A55 roadworks should be done 24/7 to get their job done - its a primary road and work should be over and done with not a 9-5 mon to friday job
Inept management by Conwy Council, North Wales Trunk Road Agency and the Welsh Goverment
Please review
Very little consideration to half-time holidays. And how much did the work on Penmaenmawr roundabout last year cost given that it's now being removed.
This is turning my already 50 minute commute into a 2.5 hour one on some occasions!
Driving through there seems to be very few people working. Why can't they just cone off one small section at a time? Why can't they get an army of workers in and get the work done in a couple of weeks? It's regularly taking one and a half hours to get home after work, which is unacceptable!
I've been hit in the back while crawling. Luckily no damage but still very unsettling!
The chaos during peak times needs to be addressed!
It will effect our family lots and with my mum being disabled would take far too long to get places, stuck in the traffic. The money that will be lost to Anglesey too will be huge.
I had to que with my horse for 90mins last week. He was terrified whist I was in the tunnel due to the loud noise in there. I was stressed out to the point I was sweating as I thought he was going to injure himself. Now I am trying my best to avoid going down the A55 yet again. It's a joke that this treach of road is only open 50% of the time since it was built. Don't you people realize it's the only road to get in and out of north wales without having to travel miles and miles out of your way.
cant this work be done during evening hours
i work at both Llandudno Hospital and Ysbyty Gwynedd and these delays are causing so many problems for both staff and patients alike!
Use some commen sense please,or is this too much to ask ???
Making my journey to work untenable. Adding 2hours to my day!
Yet again poorly planned A55 roadworks causing massive inconvenience and significant economic costs to the residents and visitors to North Wales. A rethink is required urgently!
we are living under siege in Conwy can't get to work on time disgusting that a vital arterial route is managed in this way.when it is all about the workforce being to lazy to remove cones
takes 1-3 hours to get home when should be 40 mins joke
2 hours to do 5mins!!! Every day!!! Sort it out!!!