Skip to main content

Stop Unauthorized ₱31.5M Assessment at Spring Residences

25 Comments

R
Rosita Kuo Verified
1 month ago

Complain for assesment

A
Angelita Mercado Verified
1 month ago Featured

These special assessments are for redecorating external walls and re-waterproofing roofs. It is clear, looking at the walls, that the original decoration was done poorly. These are rectification works that should be done at no cost to us. Regarding the roof waterproofing, there is only one reason that a roof needs to be completely re-waterproofed after just four or five years. That is, the original work was done poorly. These works should be done by the original contractor under warranty.

Y
Yvy Elyana Verified
1 month ago

NABONG UNIT 1201 TOWER 3

I
Ivy Jean Calleja Verified
1 month ago Featured

No transparency on the assessment made by the Condo Corp of Spring Residences. No consultation or proper info to the unit owners before imposing this special assessment . Spring Residences is not yet an old building to have this Special assessment. I have other Condo’s too in other project. But dont have special assessment like this. My unit here was turn over last 2 years ago only

C
Clem Sabarias Verified
1 month ago

Because i am one of the owner