Dear Corte Madera Neighbors:
Please join us — by promptly signing this petition — in strongly urging the Town of Corte Madera to conduct a comprehensive study on the undergrounding of power lines to reduce the potential for wildfire in high-risk hillside areas as part of the Corte Madera Climate Adaptation Plan. The threat of wildfire is immediate, imminent and ever-present. The Undergrounding Advocacy Committee is committed to reducing the risk of wildfires in our forested hillsides that are so prone to the high winds that down power lines - making Corte Madera safer for all residents. The deadline to provide input into the Climate Adaptation Plan is February 7, 2021.
This petition recommends that the study should (at a minimum):
1. Be conducted by a recognized independent third party power line undergrounding expert;
2. Contain specific goals and objectives, and specify timeframes for commencement and completion of the study;
3. Include installation options, like a phased-in approach that prioritizes the highest risk areas like Christmas Tree Hill, and an assessment of the pros and cons of undergrounding if above ground power lines exist in adjacent areas;
4. Include a cost analysis and identify all possible funding options;
5. Be listed as a priority adaptation strategy in the Climate Adaptation Plan;
6. Be commenced and completed with a sense of urgency.
Thank you. Please sign now!
The Corte Madera Undergrounding Advocacy Committee
Most developed countries have underground utilities, because it is the safest and cheapest solution in the long run. PG&E is not interested in changing the current situation because they are getting paid for maintaining the above ground infrastructure but have been skimping on actually doing the work. If they had to pay the actual cost then the wires would go underground very fast.