1. Both developer and main con do not reply to email and enquires.
2. Materials for laminate flooring are poor, widespread of gaps and lippage even though after rectification. Rectification works are questionable, ie using super glue to fix up lippage at corner edge...
3. Request for detail drawing on floor trap connection and waterproofing details till date was not given, we have different types of connection and big gaps for the floor trap connection.
4. Tonal variation on kitchen, yard and toilet floor tiles. Despite going through two times of hacking and rectifying, wifespread of tonality on floor tiles still exist.
5. Water pipping routing plan does not reflect accordingly to the as-built drawings given by developer. Yard ceiling was found to be partial box up due to services running above yard instead of the two toilets.
6. All doors was found to have signs of fading especially the main door even though it is only just a few months after TOP
59, #04-18
The irony was not lost on me that they were so efficient in billing me for maintenance (6mths at that) while not as effecient when it came to rectifying the defects.
1. Both developer and main con do not reply to email and enquires. 2. Materials for laminate flooring are poor, widespread of gaps and lippage even though after rectification. Rectification works are questionable, ie using super glue to fix up lippage at corner edge... 3. Request for detail drawing on floor trap connection and waterproofing details till date was not given, we have different types of connection and big gaps for the floor trap connection. 4. Tonal variation on kitchen, yard and toilet floor tiles. Despite going through two times of hacking and rectifying, wifespread of tonality on floor tiles still exist. 5. Water pipping routing plan does not reflect accordingly to the as-built drawings given by developer. Yard ceiling was found to be partial box up due to services running above yard instead of the two toilets. 6. All doors was found to have signs of fading especially the main door even though it is only just a few months after TOP
Liu Lihua Blk 51 #06-03
Blk 67 #11-34
Blk 61 #10-23
Blk 61 #08-21
Blk 65 #03-29
Melissa Heng Hui Yong Blk 55, 10-09 [email protected]
Sppt all items raise by all the residence in citylife..
Main con had to clear the water stagnant in the floor waste for balcony and yard area.
Jeffrey Or Blk 67,#07-34 [email protected]
59, #04-18 The irony was not lost on me that they were so efficient in billing me for maintenance (6mths at that) while not as effecient when it came to rectifying the defects.
67, #06-32
Blk 59 #04-17
Name: Neo Sor Sin Blk :65 Unit :#06-31 Email: [email protected]
Blk 55, #08-10
Blk63 #02-24
Poor workmanship and poor material quality provided.
59 #08-19
Noorfendi Saliman Blk 55 #11-08 [email protected]
Chia Ti Yan Block 55 #04-10 [email protected]