Petition Against The Total Road Closure in Graveney
148 Comments
A
Anonymous
10 months ago
9 weeks in to long to shut as we rely on the road
J
Jackie Seager
10 months ago
It would make life very difficult for everyone ana big inconvenience
D
David Jones
10 months ago
The proposed full closure of the road through Graveney will be a massive inconvenience which will have disruptive, cost, welfare and safety consequences.
L
Lesley MacDonald
10 months ago
The total road closure will be a total nightmare for my family who live in Graveney - a diversion through Whitstable will be a total nightmare. THINK AGAIN AND STOP THIS ROAD CLOSURE
S
Sarah Jones
10 months ago
The closure of the road will cause massive disruption, inconvenience and risk to the residents of the village.
W
Wendy Pryke
10 months ago
This is rediculous to shut the road off for 9 weeks. Surely a traffic light system can be put in place.
N
Nick Munday
10 months ago
No need to close the road completely, why not sheet it when and where they're not working on it
G
Gavin Hawgood
10 months ago
There has to be an alternative plan to the current totally disruptive & unacceptable 2-months one.
G
Geoffrey Trout
10 months ago
This can't be allowed. We have to have access to our homes without having to go many miles around the works to get home. Temp lights are surely the answer. What about the bus route? What about parents driving their children to the school?
M
Mark Fagg
10 months ago
I use this road regularly as a cyclist. There are no sensible road alternatives between Faversham and Whitstable
M
Michael Collett
10 months ago
It's ridiculous the amount of times the roads around graveney are closed over the last year I've been late for appointments due to traffic being diverted if the job was done properly in the first place there would be no need to cause local people and businesses the hassle of getting places
N
Neil Webster
10 months ago
This is wholly unacceptable for the businesses, school and residents of Graveney.. we have endured years of traffic congestion from the Solar park this is a step too
A
Alan Stewart
10 months ago
This closure is very badly planned.
G
Gregory Ovenden
10 months ago
We have a 3 year old who needs fast access to childcare. Shutting the entire road is not an acceptable course of action.
Also we have large battery storage for the solar farm. If that catches fire the fire services are really going to struggle to respond. As with any elderly residents of the villages. How will emergency services reach them should they need it?
K
Kim Sully
10 months ago
Featured
I am a resident of Goodnestone and feel we are being unfairly treated and abandoned to “get on with it” by an enforced total road closure, when a partial road closure with access via the use of temporary traffic lights, would be a much more considerate and constructive option.
L
Lut Stewart
10 months ago
This is an unreasonable amount of time for this important road to be closed. This should have been discussed with the residents beforehand and planned in stages and the work undertaken overnight.
N
Nadia Ward
10 months ago
This is completely impractical for those living and working in the area.
T
Tom
10 months ago
Headhill Road should not be totally closed for 2 months. There must be a traffic light system installed to allow movement for local residents., as the alternative route is ridiculous.
S
Sam Bowen
10 months ago
Featured
My severely disabled daughter needs access to emergency care at home and ambulance services. She also has a KCC school transport contract which cannot be fulfilled if the road is fully closed. Therefore this would actually cost KCC as school bus cannot get to us another way.
J
Jamie Breach
10 months ago
We are a small community with just 1 road, isolating us like this is unacceptable, especially as there are ternative ways of doing the work
9 weeks in to long to shut as we rely on the road
It would make life very difficult for everyone ana big inconvenience
The proposed full closure of the road through Graveney will be a massive inconvenience which will have disruptive, cost, welfare and safety consequences.
The total road closure will be a total nightmare for my family who live in Graveney - a diversion through Whitstable will be a total nightmare. THINK AGAIN AND STOP THIS ROAD CLOSURE
The closure of the road will cause massive disruption, inconvenience and risk to the residents of the village.
This is rediculous to shut the road off for 9 weeks. Surely a traffic light system can be put in place.
No need to close the road completely, why not sheet it when and where they're not working on it
There has to be an alternative plan to the current totally disruptive & unacceptable 2-months one.
This can't be allowed. We have to have access to our homes without having to go many miles around the works to get home. Temp lights are surely the answer. What about the bus route? What about parents driving their children to the school?
I use this road regularly as a cyclist. There are no sensible road alternatives between Faversham and Whitstable
It's ridiculous the amount of times the roads around graveney are closed over the last year I've been late for appointments due to traffic being diverted if the job was done properly in the first place there would be no need to cause local people and businesses the hassle of getting places
This is wholly unacceptable for the businesses, school and residents of Graveney.. we have endured years of traffic congestion from the Solar park this is a step too
This closure is very badly planned.
We have a 3 year old who needs fast access to childcare. Shutting the entire road is not an acceptable course of action. Also we have large battery storage for the solar farm. If that catches fire the fire services are really going to struggle to respond. As with any elderly residents of the villages. How will emergency services reach them should they need it?
I am a resident of Goodnestone and feel we are being unfairly treated and abandoned to “get on with it” by an enforced total road closure, when a partial road closure with access via the use of temporary traffic lights, would be a much more considerate and constructive option.
This is an unreasonable amount of time for this important road to be closed. This should have been discussed with the residents beforehand and planned in stages and the work undertaken overnight.
This is completely impractical for those living and working in the area.
Headhill Road should not be totally closed for 2 months. There must be a traffic light system installed to allow movement for local residents., as the alternative route is ridiculous.
My severely disabled daughter needs access to emergency care at home and ambulance services. She also has a KCC school transport contract which cannot be fulfilled if the road is fully closed. Therefore this would actually cost KCC as school bus cannot get to us another way.
We are a small community with just 1 road, isolating us like this is unacceptable, especially as there are ternative ways of doing the work