The Board of Selectmen officially approved the original Plan D today. This victory belongs to every person who signed and pushed back against those budget cuts. Stay ready because we will keep a close eye on the construction phase to ensure the project stays on track.
I join with other residents of the town of Fairfield, CT, in professing my support for the ORIGINAL "Plan D" submitted to the Board of Selectmen (BOS) by the Fairfield Woods Middle School (FWMS) Building Committee.
I understand that the FWMS Building Committee voted 8 to 1 in favor of the ORIGINAL "Plan D". I understand that the BOS recommended to the Board of Finance (BOF) that the project move ahead however scaled down by $4.4M and to be funded & built in phases over several years.
I understand the ORIGINAL "Plan D" was designed to the Board of Education (BOE) specification to accommodate 840 students, 30% MORE STUDENTS, with increased classrooms and core facility space such as cafeteria, kitchen, nurses station, as well as auditorium, Physical Education and PT/OT additions.
This is a townwide middle school issue - not just a FWMS issue. Both Tomlinson Middle School and Roger Ludlowe Middle School (RLMS) are currently overcrowded and cannot fit anymore students or do any more renovations. An addition to FWMS would alleviate overcrowding at all middle schools in town.
It is unacceptable that there is an enormous disparity between the facilities at FWMS and the facilities at Tomlinson and RLMS and that students at FWMS experience overcrowding, insufficient cafeteria space, longer lunch lines, and crowded gym and library facilities.
I understand that the Tomlinson Middle School project cost the town $28MM for 35,000 square feet of "ground up" construction and a renovation of 160,000 existing square feet. The ORIGINAL "Plan D" will cost the town $24MM adding 45,000 square feet of "ground up" construction and renovating over 175,000 existing square feet. With this renovation project we are getting more for our money.
I, as one of the undersigned, wish to send a message to the BOF, as well as the BOS, the BOE, and the Representative Town Meeting (RTM), showing my support of the ORIGINAL "Plan D" and urging them to approve the ORIGINAL "Plan D".
The Board of Selectmen is ignoring the reality that this is a townwide crisis rather than just a Fairfield Woods issue. Contact your representatives today to demand they stop stalling on the original Plan D. Use your social media accounts to post the link to this petition so the town officials realize they cannot hide from our local community.
February 22, 2010
The momentum behind our push for the original Plan D is growing and the town is finally starting to pay attention. Send a direct email to your representative on the Board of Finance today to demand they stop stalling on this project. Post the petition link to your Facebook page right now so we keep the pressure on.
Reached 100 supporters
February 22, 2010
6 Comments
B
Brenda Nkemelu
16 years ago
Featured
fairfield taxes are high enough already so give us the school capacity we are paying for. no more phase-in nonsense.
T
Tom Medina
16 years ago
Featured
8-1 vote says it all. listen to the committee and stop messing around with something the town actually needs.
D
Dave Fletcher
16 years ago
Featured
Total incompetence by the board. These schools are bursting at the seams and they want to pinch pennies. Fix it NOW.
J
Jessica Osborne
16 years ago
Featured
the overcrowding is getting out of control. kids at fwms deserve the same quality facilities as the other schools. do the right thing.
S
Sarah Powell
16 years ago
Featured
my kids have been dealing with the hallway traffic at lunch for way too long. plan d is the only one that actually fixes the problem.
M
Mike Owens
16 years ago
Featured
Enough with the cuts. Just build the thing right the first time so we dont have to deal with this headache again in 5 years.
Share this petition
Share this petition to help it reach more people.
Your share link
Couldn't copy automatically. Long-press to copy:
Share directly
The Board of Selectmen officially approved the original Plan D today. This victory belongs to every person who signed and pushed back against those budget cuts. Stay ready because we will keep a close eye on the construction phase to ensure the project stays on track.
I join with other residents of the town of Fairfield, CT, in professing my support for the ORIGINAL "Plan D" submitted to the Board of Selectmen (BOS) by the Fairfield Woods Middle School (FWMS) Building Committee.
I understand that the FWMS Building Committee voted 8 to 1 in favor of the ORIGINAL "Plan D". I understand that the BOS recommended to the Board of Finance (BOF) that the project move ahead however scaled down by $4.4M and to be funded & built in phases over several years.
I understand the ORIGINAL "Plan D" was designed to the Board of Education (BOE) specification to accommodate 840 students, 30% MORE STUDENTS, with increased classrooms and core facility space such as cafeteria, kitchen, nurses station, as well as auditorium, Physical Education and PT/OT additions.
This is a townwide middle school issue - not just a FWMS issue. Both Tomlinson Middle School and Roger Ludlowe Middle School (RLMS) are currently overcrowded and cannot fit anymore students or do any more renovations. An addition to FWMS would alleviate overcrowding at all middle schools in town.
It is unacceptable that there is an enormous disparity between the facilities at FWMS and the facilities at Tomlinson and RLMS and that students at FWMS experience overcrowding, insufficient cafeteria space, longer lunch lines, and crowded gym and library facilities.
I understand that the Tomlinson Middle School project cost the town $28MM for 35,000 square feet of "ground up" construction and a renovation of 160,000 existing square feet. The ORIGINAL "Plan D" will cost the town $24MM adding 45,000 square feet of "ground up" construction and renovating over 175,000 existing square feet. With this renovation project we are getting more for our money.
I, as one of the undersigned, wish to send a message to the BOF, as well as the BOS, the BOE, and the Representative Town Meeting (RTM), showing my support of the ORIGINAL "Plan D" and urging them to approve the ORIGINAL "Plan D".
The Board of Selectmen is ignoring the reality that this is a townwide crisis rather than just a Fairfield Woods issue. Contact your representatives today to demand they stop stalling on the original Plan D. Use your social media accounts to post the link to this petition so the town officials realize they cannot hide from our local community.
February 22, 2010
The momentum behind our push for the original Plan D is growing and the town is finally starting to pay attention. Send a direct email to your representative on the Board of Finance today to demand they stop stalling on this project. Post the petition link to your Facebook page right now so we keep the pressure on.
Reached 100 supporters
February 22, 2010
6 Comments
B
Brenda Nkemelu
16 years ago
Featured
fairfield taxes are high enough already so give us the school capacity we are paying for. no more phase-in nonsense.
T
Tom Medina
16 years ago
Featured
8-1 vote says it all. listen to the committee and stop messing around with something the town actually needs.
D
Dave Fletcher
16 years ago
Featured
Total incompetence by the board. These schools are bursting at the seams and they want to pinch pennies. Fix it NOW.
J
Jessica Osborne
16 years ago
Featured
the overcrowding is getting out of control. kids at fwms deserve the same quality facilities as the other schools. do the right thing.
S
Sarah Powell
16 years ago
Featured
my kids have been dealing with the hallway traffic at lunch for way too long. plan d is the only one that actually fixes the problem.
M
Mike Owens
16 years ago
Featured
Enough with the cuts. Just build the thing right the first time so we dont have to deal with this headache again in 5 years.
fairfield taxes are high enough already so give us the school capacity we are paying for. no more phase-in nonsense.