We, the undersigned, as property owners in the area most affected by the flooding of the Port Colborne/Fort Erie municipal drain, hereby demand that the Town of Fort Erie immediately honor its pledge to remedy the broken gate at the terminus of the drain on Pt. Abino Rd. at Abino Hills Rd. by whatever means and solutions necessary, including alternatives to the re-installation of the south side of the flap gate.
There is no need to reinvent the wheel. In the 70's during the high water years, there was a screw operated gate value which was kept shut and a pump that ran 24/7 to pump water from a vertical culvert over the gate. Please help us now!