This is a major disruption to the local area & costing a fortune in extra fuel costs
M
Millie Eastman
Also traffic builds up in ALL other roads especially at school times - makes it so dangerous on such small roads
N
Nicky Wonnacott
If these timing of these works has now been extended to possibly to 18months then this is totally unacceptable!!
T
Tracey Pearce
I have two five year grandchildren in abbotsham school both just been diagnosed with epilepsy Ian’s having fits takes me 15mins to get to them rather then 3 mins
A
Anonymous
This road closure is having such an impact on me and our children 1 and 2.
This is a major disruption to the local area & costing a fortune in extra fuel costs
Also traffic builds up in ALL other roads especially at school times - makes it so dangerous on such small roads
If these timing of these works has now been extended to possibly to 18months then this is totally unacceptable!!
I have two five year grandchildren in abbotsham school both just been diagnosed with epilepsy Ian’s having fits takes me 15mins to get to them rather then 3 mins
This road closure is having such an impact on me and our children 1 and 2.