Oliver Von Gundlach 0

STOP FPL TRANSMISSION LINE IN SOUTH MIAMI

45 people have signed this petition. Add your name now!
Oliver Von Gundlach 0 Comments
45 people have signed. Add your voice!
45%
Maxine K. signed just now
Adam B. signed just now

Say "NO" to FPL High Voltage 100-ft. Power Lines. FPL plans to run high-voltage power lines through our communities! Most folks don't know this, but FPL's preferred route for running 100-foot towers carrying 230-KV high-voltage powerlines north from Turkey Point to Miami and beyond is right up South Dixie Highway right alongside the Metrorail ... creating an incredibly unsightly gateway into all the business districts and neigbhborhoods along the way! The high-voltage lines would run from Davis substation, located between SW 136th Street and SW 140th Street and west of the Turnpike Extension, all the way to the downtown Miami substation. Go to FP&L Website for info on the lines. Come to the public Hearing & Voice your Concern. Monday, March 2nd, 2009 @ 7pm South Miami City Commission Chambers South Miami City Hall 6130 Sunset Drive. South Miami, Fl.33143. Sign the petition! (forget the donation page) See Map with details of the proposed routes online at: http://www.fpl.com/environment/lines/tp.shtml Links check them out! Residents are concerned about proposed high voltage lines. http://coconutgrovegrapevine.blogspot.com/2009/02/residents-concerned-about-proposed-high.html Opposition to FPL Turkey Point transmission lines growing. http://stopfpl.blogspot.com/2009/02/opposition-to-fpl-turkey-point.html FP&L's Proposed High Voltage Lines Irritates an Eye on Miami Reader. By Geniusofdespair. http://eyeonmiami..blogspot.com/2009/02/fp-proposed-high-voltage-lines.html

Sponsor

Concerned South Miami Residents.

Links

http://www.brain101.info/EMF.php http://www.fiu.edu/~mizrachs/EMF-Hazards.html
Share for Success

Comment

45

Signatures