The people who use the Wimbledon Loop of the Thameslink Service would like: 1. All services to
continue through London Blackfriars and beyond after 2018, rather than terminate in the new bay
platforms requiring a change of train and platform in order to access cross London services. 2. An
increase to the current 8 trains per hour service on weekdays between 8am and 9am to a minimum of
12 trains per hour to reduce the current significant overcrowding. 3. Serious consideration be given
to stopping the new 12 car Thameslink trains at Herne Hill and other stations with shorter platforms
along the Wimbledon loop, utilising selective door operation, which already works successfully on
many other existing routes.